Full bathroom renovation with 3D design, material selection, an itemised quote and site supervision. See the design, cost and stages before work begins.

🏠 | 📋 | ⏱️ | 🔨 |
|---|---|---|---|
3D Bathroom Design | One Project Lead | A Clear Schedule | Complete Renovation |
See the layout, materials and finished design before work begins. | One person coordinates the trades, plumbing and installation. | Know what happens from strip-out through to handover. | Plumbing, tiles, bathroom fittings, furniture and final installation, with site supervision. |
Service overview
A bathroom renovation needs careful design, accurate installation and suitable materials to create a room that is practical, durable and contemporary.
Design Chama renovates bathrooms across Mesogeia. We provide full design, 3D visuals and construction, with supervision through to handover.
We start by looking at what the room needs and adapt the design to the way you use it and what matters to you.
We handle the whole process, from strip-out and plumbing to fitting tiles, sanitaryware, bathroom furniture and lighting. The aim is a bathroom that works well, looks considered and is built to last.
Why choose Design Chama?
If you are planning a larger upgrade, explore our services for a full home renovation in Mesogeia.
A bathroom brings together moisture, utilities and everyday use. We pay close attention to installation and check each stage of the work.
A design that makes the most of the available space.
Quality materials and suitable installation methods.
Experienced trades with plumbing and construction expertise.
A clear schedule and supervised work.
Microcement is an option when the right waterproofing system is specified and properly installed.
Our full renovation process has three stages, so you can see what needs to happen and how the work is scheduled.
01
Free estimate and initial consultation
02
Design and project planning
03
Construction, supervision and handover


This bathroom renovation was carried out in a home in Mesogeia. The work included stripping out old tiles and services, replacing the plumbing, installing new waterproofing, finishing the walls and floor, and fitting a vanity and sanitaryware. The project took 10 working days.
What is included
A full bathroom renovation covers the stages needed to make the room practical, durable and well built.
Strip-out of old fittings and materials
Plumbing and electrical work
Waterproofing and tiling
Installation of new bathroom furniture and sanitaryware
Lighting and finishing details
Areas we serve
We renovate bathrooms in the following areas.
Keratea
Kalyvia Thorikou
Lavrio
Markopoulo Mesogaias
Koropi
Paiania
Pallini
Rafina and Pikermi
Spata and Artemida
Porto Rafti
Saronida, Anavyssos and Lagonisi
Marathonas
Sounio
Bathroom renovation costs
The cost depends on the materials, plumbing work and fittings you replace. We assess each bathroom so you have a clear budget before work begins.
For detailed pricing and examples, see our guide to bathroom renovation costs in Mesogeia in 2026. It explains the price ranges and what affects the final cost.
Bathroom renovations in Mesogeia range from a simple refresh to a complete replacement of plumbing and finishes. The cost depends on the condition of the room, the tiles, sanitaryware and furniture you choose, and the technical work required.
The work can range from surface changes to a full strip-out and replacement of services, which affects both timing and cost.
Before work begins, Design Chama provides an itemised quote and a detailed scope so you can see the cost, schedule and work covered.
Frequently asked questions about bathroom renovation
How much does a bathroom renovation cost?
The cost depends on the work, materials and sanitaryware. For detailed examples and prices, see our guide to bathroom renovation costs in Mesogeia in 2026.
How long does a bathroom renovation take?
It usually takes 7 to 15 working days, depending on the scope.
Do I need a permit?
The procedure depends on the work involved. The responsible engineer checks whether approval or a permit is needed before work starts.
Can I stay at home during the renovation?
If it is your only bathroom, staying depends on having a usable alternative and keeping the work safely separated. We agree when water and bathroom access will be interrupted before work begins. You may need to stay elsewhere temporarily.
Do you offer 3D design?
Yes. We can show you a 3D visual of the room before work starts.
Planning a bathroom renovation in Mesogeia? Get in touch for a free site visit and a proposal tailored to your room and budget.
For an initial estimate, use the renovation cost calculator and select the bathroom work you are considering. We can provide a detailed quote after the site visit.
Contact hours 09:00–21:00 (Monday to Friday)



